📅 Filter by year:
Audit & Inspection Progress · MNT
By status
Audit vs Inspection · closed vs in-progress
Report Progress
MCAR · Internal Audit Findings
AMO ECAR · Authority Findings
| Report No ↕ | Form ↕ | Status ↕ | Owner ↕ | Raised Date ↕ | Target Date ↕ | Days to Due ↕ | CAT ↕ | Finding Level | Repetitive | Audit Title |
|---|
—
CAT I · ≤ 30 days
—
All forms
CAT II · 30–60 days
—
All forms
CAT III · > 60 days
—
All forms
By CAT
By Form Type
| Report No ↕ | Form ↕ | Raised Date ↕ | Target Date ↕ | Days to Due ↕ | CAT ↕ | Finding Level | Audit Title |
|---|
—
KPI Charts
Total Findings
—
Open
—
Overdue
—
On-time Rate
—
CAT III
—
Audits
—
KPI 2 — Early Detection (Internal vs Authority)
MCAR vs AMO-ECAR theo Nature of finding (nhóm cha) — bức tranh khối lượng phát hiện
—
—
KPI QC — (CMR-CAR gán cờ QC + QC Spot Check) vs ECAR theo ATA
Tử = CMR-CAR + QC Spot Check tháng N−1 · Mẫu = ECAR tháng N
QC (CMR-CAR gán cờ + QC Spot Check) · tháng N−1
ECAR (authority) · tháng N
| ATA Chapter | Internal (N−1) | ECAR (N) | Ratio | Assessment |
|---|
Early-detection rate
—
AMO-ECAR phát hiện sớm ÷ tổng AMO-ECAR × 100%
AMO-ECAR đã phát hiện sớm (MCAR sớm hơn, cùng Nature/nội dung)
—
AMO-ECAR (authority) findings
—
| Group | Phát hiện sớm | AMO-ECAR (tổng) | Rate % |
|---|
—
| Report No ↕ | Status ↕ | Raised Date ↕ | Target Date ↕ | Days to Due ↕ | Report Ref | Request For Verification | Verification Result | Department | RFI | Audit Ref (MNT) | Audit Title |
|---|
—
| Report No ↕ | Aircraft ↕ | Status ↕ | Findings ↕ | Department | Raised Date ↕ | Target Date ↕ | Days to Due ↕ |
|---|
—
| Report No ↕ | Aircraft ↕ | Status ↕ | Finding Description | Raised Date ↕ | Target Date ↕ | Days to Due ↕ | Detail |
|---|
—
AMO-ECAR — Authority Findings (issued to AMO)
Total
—
Open
—
Overdue
—
Closed
—
| Report No ↕ | Status ↕ | Raised ↕ | Target ↕ | Days to Due ↕ | CAT ↕ | Audit Title | Finding Description |
|---|
—
MCAR — Internal Audit Findings
Total
—
Open
—
Overdue
—
Closed
—
| Report No ↕ | Status ↕ | Raised ↕ | Raised by ↕ | Target ↕ | ⚠ Deadline | Days to Due ↕ | CAT ↕ | Audit Title |
|---|
—
SPI — Safety Performance Indicators
Target: Vietjet AMO's SPI must meet or better than the SPT (ALOS) approved by CAAV
📊 Bottleneck Analysis — Stage Status Aggregate
Loading data…
| Audit No ↕ | Title ↕ | Type ↕ | Status ↕ | Scheduled ↕ | Lead | Location ↕ | Findings ↕ | Open | Overdue | Pipeline | Workflow |
|---|
—
| Doc No | Title | Document Type | Rev | Status | Owner | Review date | Distributed |
|---|
Filter by
Year
Month
Form Type
All forms
▼
VietJet Air · Quality Assurance AMO
QA AMO — Summary Report
—
Exported: —
Total: —
KPI Summary
Charts
By status
Top Form Types
Findings by Month
Overdue Analysis
| CAT | Count | Rate | Description |
|---|
Summary by Form
| Form | Open | Overdue | On-time | Lately | Closed | Total | % |
|---|
Detail
| Report No | Form | Status | Raised | Target | Days | CAT | Audit |
|---|
VietJet Air · Quality Assurance AMO
User Guide
QA AMO Dashboard · Full documentation
Contents
📅
Bộ lọc năm (mới) — chọn 1 năm, 2 năm hoặc tất cả
Tất cả bộ lọc năm trên mọi trang giờ là một menu chọn nhiều năm.
Bấm vào nút 📅 để mở danh sách:
tích "All years" để xem toàn bộ, hoặc tích từng năm để
so sánh (ví dụ chọn 2024 và 2025 cùng lúc).
Nhãn nút hiển thị các năm đang chọn (vd "2025, 2024") — bảng và biểu đồ cập nhật ngay.
Trang Overview, KPI Charts và SPI mặc định chọn năm hiện tại.
📖
Definitions & Terminology
Report Status
Open
Report is being processed, not yet due or has no target date. The assignee must carry out corrective action.
Overdue
Report has passed its target date but has not been closed. Must be prioritised immediately. Further classified by CAT I/II/III.
On-time Closed
Report closed on or before its target date. Applies only to forms that have a target date (CAR, MCAR, PAVOI…).
Lately Closed
Report was closed after its target date. Root-cause analysis is recommended to improve the on-time rate.
Closed
Report closed with no target date (Surveillance Report, Aircraft Inspection…). Not counted in the on-time rate.
Overdue Category (CAT)
CAT I
Overdue ≤ 30 days — Monitor closely and follow up within the week.
CAT II
Overdue 30–60 days — Escalate to senior management and request a corrective action plan.
CAT III
Overdue > 60 days — Critical. Report immediately to senior leadership and take urgent action.
QA AMO Form Types
Surveillance Report (SR)
Periodic surveillance report. No target date. Generated from Inspection activities.
Aircraft Inspection/Spot Check (AISC)
Random or scheduled aircraft inspection at the ramp.
MCAR
Mandatory Corrective Action Report — Mandatory corrective action report from internal audits.
PAVOI
Post Audit Verification of Implementation — Tracks implementation of corrective actions.
CAR
Corrective Action Report — Corrective action report from external audits or CAAV.
MOR
Mandatory Occurrence Report — Mandatory occurrence report as required by CAAV regulations.
AMO ECAR
Internal AMO Electronic Corrective Action Report.
Battery Workshop Inspection (BWI)
Periodic battery maintenance workshop inspection — once per month.
KPI Definitions
On-time Rate
= On-time Closed ÷ (On-time Closed + Lately Closed) × 100%. Calculated only on forms with a target date. Target: ≥ 70%.
Repetitive Rate
= Number of repeated findings ÷ Total findings × 100%. Findings marked "Repetitive = Yes" in the form. Target: ≤ 10%.
Days to Due
Days remaining until the target date (positive = within deadline, negative = overdue). Calculated from today.
📊
Page Guide
📄
Export Reports
🔑 Admin Only
Mọi chức năng xuất báo cáo (PDF/Excel ở trang Export Reports, cũng như các nút
⬇ PDF/Excel trên CMR-CAR, ECAR, Audit Plan, Query Builder…) chỉ hiển thị và hoạt
động với tài khoản Admin. Người dùng thường (Viewer) sẽ không thấy các nút này.
📄 Export PDF
Export report as a PDF for printing or emailing.
PDF contents include:
• VietJet red header with report title
• 6 KPI cards
• 3 charts (Status, Top Forms, Monthly)
• Overdue by CAT analysis table
• Summary table by Form type
• Finding details (up to 200 records)
PDF is automatically paginated to A4.
PDF contents include:
• VietJet red header with report title
• 6 KPI cards
• 3 charts (Status, Top Forms, Monthly)
• Overdue by CAT analysis table
• Summary table by Form type
• Finding details (up to 200 records)
PDF is automatically paginated to A4.
📊 Export Excel
Export a .xlsx file for further analysis in Excel.
Excel file has 3 sheets:
• Sheet 1 — KPI Summary: KPI totals and Overdue CAT breakdown
• Sheet 2 — Form Summary: Open/Overdue/On-time/Lately/Closed per form type
• Sheet 3 — Detail Data: All findings with full field data
Filename is auto-generated with the report title and export date.
Excel file has 3 sheets:
• Sheet 1 — KPI Summary: KPI totals and Overdue CAT breakdown
• Sheet 2 — Form Summary: Open/Overdue/On-time/Lately/Closed per form type
• Sheet 3 — Detail Data: All findings with full field data
Filename is auto-generated with the report title and export date.
🔧 How to use the Export page:
Step 1: Open Export Reports from the left sidebar
Step 2: Choose a filter type from the "Filter by" dropdown:
• By Month/Year → select a specific Year and Month
• By Quarter/Year → select a Year and Quarter (Q1–Q4)
• By Form Type → select a specific form (MCAR, PAVOI…)
• All → no filter, loads all data
Step 3: Review the report preview on the page
Step 4: Click 📄 PDF or 📊 Excel to download
Step 2: Choose a filter type from the "Filter by" dropdown:
• By Month/Year → select a specific Year and Month
• By Quarter/Year → select a Year and Quarter (Q1–Q4)
• By Form Type → select a specific form (MCAR, PAVOI…)
• All → no filter, loads all data
Step 3: Review the report preview on the page
Step 4: Click 📄 PDF or 📊 Excel to download
💡
Frequently Asked Questions
| Full Name | Username | Role | Registered | Actions |
|---|
🔬 Query Builder
Tự truy vấn dữ liệu Galileo — không cần code. 4 bước: ① chọn bảng → ② tích cột → ③ thêm điều kiện lọc → ④ bấm Run Query
Bước 1 · Bảng chính (Primary Table)
Chọn bảng dữ liệu nguồn, rồi tích những cột muốn hiển thị.
Fields to display:
|
Select a table first
Bước 2 · Ghép bảng (Join) — tùy chọn
Bỏ qua nếu chỉ cần 1 bảng. Ghép thêm bảng liên quan khi cần đối chiếu.
Bước 3 · Điều kiện lọc (Filter) — tùy chọn
Thêm điều kiện để thu hẹp kết quả (vd: năm = 2025, trạng thái = Open).
OData nodes0 / 100
Bước 4 · Sắp xếp & giới hạn (Sort & limit)
Chọn cột sắp xếp và số dòng tối đa, rồi bấm Run Query bên dưới.
Row limit
🔬
Pick a table → check fields → add filters → Run Query
Pick a table → check fields → add filters → Run Query
My Dashboard
🔑 Admin Only
Các widget bạn đã ghim từ Query Builder. Mở Query Builder → chạy truy vấn → bấm 📌 Pin để thêm widget vào đây.